WYCKOFF WATER TREATMENT FACILITY
An EPA Superfund Site
Client: US GOVERNMENT
Location: BAINBRIDGE ISLAND, WA
Installation of fiberglass tanks in an outside tank farm to pre-filter and separate solids. The completed project allowed the transfer to the main process plant routed through carbon filter tanks and of separating systems to clean ground water and return process water back into Puget Sound.
Services Included:
- Installation of (5) 3,000 gallon Carbon Filtration Tanks
- Underground Piping from the Filtration Tanks to the Tank Farm
- Installation of new 8” Underground Ductile Potable Water Line
- Underground Air, Storm and Sewer Piping
- Installation of Double Contained Piping from the Filtration Tanks to the Tank Farm
- Installation of Electrical Duct Bank