BONNEVILLE DAM
Columbia River Spillway Upgrades

Client:   US GOVERNMENT
Location:   BONNEVILLE DAM, WA

  • Pre-Design Measuring, Layout & Pre-Fabrication
  • Installation of 2400 feet of 6” Concrete Lined Water Line
  • Heat-Traced Piping
  • Insulation with High Density Foam
  • Metal Jacketing Application and Painting